CV créé le :
07/08/2023
CV modifié le :
07/08/2023
Dernière connexion :
07/08/2023
Coordonnées
******
*******
Adresse :
***** ****** ******* *** *** *
Paris (75000)
Email :
******.*******@*****.***
Tél. :
************
|
Career Summary, Confirmé
Référence : 667618
Expériences Professionnelles
sept. 2020
mars 2023
|
Duration
|
|
|
|
|
|
|
mars 2017
avr. 2019
|
|
|
|
|
Pioneer Cement Khushab Expansion
|
Position: Inspection Engineer
Project:
Pioneer Cement Khushab Expansion
Client:
Pioneer Cement Khushab
Responsibilities:
* Performing NDT Inspection as per Client Requirement
* UDF of Kiln structure and rotary tire
* Radiographic Testing of Boiler tubes
Client:
National Refinery Limited (NRL)
Responsibilities:
* UTG of Distillation Column
* UTG and DPT of Tank Shell and Bottom
* Ultrasonic Flaw Detection of Weld Joints
* Corrosion Mapping (Corrosion Mapping & TML)
Client:
Liberty Power Tech Limited (200 MW) Faisal Abad (Wärtsilä)
Responsibilities:
* Ultrasonic Flaw Detection of Weld Joints
* Corrosion Mapping of Sulfuric Acid Tanks
* DPT of Spools and Shafts
* Ultra-sonic Thickness Gauging of HSD Fuel Tank
* OCTG / RIGs
* OGDCL (Rig No. N-1, N-2, N-3)
* OGDCL (Rig No. N-4, N-6)
* Pakistan Oil Fields Limited ( Rig-1)
* Pakistan Oil Fields Limited Yard
* Pakistan Petroleum limited yard
* Schlumberger Yard
Client:
Askari Cement Limited Wah Rawalpindi
Responsibilities:
* UTG of Killen
* UFD and DPT of Killen tyre
Client:
Cherat Cement Company Limited Nowhere (KPK)
Responsibilities:
* UTG of Killen
* UFD of Killen tire
* DPT of Killen tire
* Organization: Ravi Green Engineering Pvt. Ltd Lahore
|
|
juil. 2016
mars 2017
|
Trainee Engineer Responsibilities
|
|
|
|
Interpret Radio Graphic Films
|
* Manage all inspections and tests including supervision of site testing laboratory, coordination
with independent testing laboratory, documenting and submitting test results, and following up
for review and approval of the client.
* Inspecting Incoming Material Quality
* Verifying MTC (Mill Test Certificates) of Incoming Material
* Fit-Up Inspection Before Welding.
* Visually Root Weld Inspection & Final Weld Inspection.
* Interpret Radio Graphic Films
* UFD, MPI, and DPT
* Make arrangements for inspecting Hydro Tests of Bowsers & Pressure Vessels
* Turnarounds and Shut Downs
* Pak Arab Fertilizer Multan
* Fatima Fert Limited Sheikhupura
* Liberty Power Tech Faisal Abad
* Pioneer Cement Khushab
|
|
Diplômes et formations
sept. 2023
juin 2025
|
M.Sc. Chemistry and Physics of Materials; On Going
- BAC+4
|
|
|
|
Paris Lodron University of Salzburg Austria
|
|
sept. 2012
juin 2016
|
B.Sc. Metallurgy and Materials Engineering
- BAC+3
|
|
|
|
Bahauddin Zakariya University Multan
|
|
sept. 2009
juin 2012
|
D.A.E Metallurgy and Welding
|
|
|
|
Government Swedish Pakistani College of Technology Gujrat
|
|
sept. 2007
juin 2009
|
|
|
|
|
Government Higher Secondary School Qadir Abad
|
|
|
ASNT NDT Level II Ultrasonic Testing
|
|
|
|
|
|
|
ASNT NDT Level II Phased Array Ultrasonic Testing
|
|
|
|
|
|
|
ASNT NDT Level II Dye Penetrant Testing
|
|
|
|
|
|
|
ASNT NDT Level II Magnetic Particle Testing
|
|
|
|
|
|
|
ASNT NDT Level II Radio Graphic Testing
|
|
|
|
|
|
|
ASNT NDT Level II Magnetic Flux Leakage
|
|
|
|
|
|
|
Passport No. NE6902242
|
|
|
|
Pakistan
|
|
Compétences
internet applications, MS Office, office, document control
Compétences linguistiques
|
Important
|
CV actualisé il y a plus de 6 mois, certaines informations peuvent ne pas être à jour.
|
|